Hello, due to the floor height difference, the landing floor level of the basement stairs is 53 cm above the floor slab. I set the elevation of the landing floor and the upper level of the beams to work together to 53 cm, but when I analyze it, I see that no reinforcement is placed on the landing floor. How can I fix this situation? I would be glad if you help.