Floor

Re: FLOORING Floors MD01 and MD02 are two continuous console floors with each other. Solution of the problem Arrange the upper left additional reinforcement of the calculation axis no. 1 of the MD02 slab as fi8/15.
 
Re: FLOOR Hello, for some reason, the slab-support association is not formed correctly in the 1st basement. Your project has been taken into our notes in this sense. To fix the problem, I copied the 1st basement to another floor with floor copy, then I copied it back to the 1st basement. You can continue your work with the attached project. Note: 1. basement raft flooring data may have changed, please review.
You do not have permission to view link Log in or register now.
Good work
 