izmirli_35_35
New Member
I defined a floor with a live load of 0.35 t/m2 where the ladder will come from and entered its elevation as -5 cm to bend the reinforcements. WHY IS THE FLOOR THICKNESS PROBLEM (under geometry control) OCCUPIED HOW CAN I OVERCOME? THANKS...