First Project, Ribbed Floor, Basin and Stairs.

serkansarp

New Member
Hello, There are a few points that we are curious about in the attached project, which is our first project. 1-) As seen in the picture, the ladder sits on the ribbed floor. The point we are wondering here is whether the calculation should be done by leaving the slab edge blank or it would be better if we place a beam around it as in the picture. In this case there are two studs very close to the middle beam, wouldn't it be better to avoid that? 2-) In this project, the upper level of the foundation is at -70 cm and the basement is at +50 cm. The column height is 280 cm from the basement and there is no basement curtain. In this case, how should or should the column and sub-basement beams be modeled in the distance between +50 and -70, that is, from the ground floor slab to the foundation? Thanks in advance for your time, Good work.
 
Below is the modified version of your project as per your request, I would have solved it that way! I hope you will benefit from it.. G. KÖSE
 
Hello, I am looking for an answer to Sekan Bey's question about how the building should be modeled in cases where the basement curtain is not used...
 
"engineer_8707":3jnzug13" said:
Hi, I am looking for an answer to the question of Sekan brain about how the building should be modeled in cases where the basement curtain is not used... I would appreciate it if you could answer it... take it easy
Hello, Mr. Serkan, as far as I understand He asks how the height of the basement and the basement should be defined. The height of the basement can be defined by adding it to the height of the ground floor as in the project added by Mr. Güray Köse. The basement curtains can also be defined in the Panel settings/Static reinforced concrete tab -Basement/continue on all floors Panel- line that does not have a ceiling should be defined by marking. If there is no basement curtain, such a definition will not be needed anyway. Good work
 
Thanks a lot for your answers. As far as I understand, a solution should be made by adding the basement height to the ground floor height. Another issue I'm curious about is the flood beams. Would it be correct to define these beams as tie beams at the ground floor slab level? According to my impression, these beams are generally not modeled and added later. Thanks, good work.
 