HELLO; WHEN I ENTER THE EXISTING BETAN STRENGTH AND STEEL CLASS IN THE RISKY CONSTRUCTION ANALYSIS, THESE VALUES ARE MULTIPLIED BY 0.9 IN THE REPORT SECTION, BECAUSE I SELECTED THE MINIMUM KNOWLEDGE LEVEL. IS THIS PROBLEM? WHAT VALUE SHOULD I ENTER IN THE RYTE FORM? THANKS
 
Re: EXISTING CONCRETE STRENGTH IN RISKY CONSTRUCTION ANALYSIS Hello, in the case of selecting 'Minimum', the material strength information entered in the material settings in accordance with RYTEIE-2019 Article 4.1.4 in the program is multiplied by 0.9 and used in the calculations. If the strength values given to you are not multiplied by this value, it would be appropriate to use the values in the reports. Good work.
 