hello, i have a 220 m2 villa project. Holster wanted me to solve it.1. Since it is a degree earthquake zone, it is obligatory to throw at least 2 curtains, one in each direction. I designed the carrier system as I added in the project. 12200 tons of reinforcement comes out. I removed the curtains, put a colon, still nothing changed. I tried at the base constantly, there was a slight decrease. I wonder if I'm doing something wrong, there shouldn't be that much equipment, I'd be glad if you could help. good work
You do not have permission to view link
Log in or register now.