Hello, In the project I analyzed, balcony reinforcements were calculated as Ø8, but when I click on the flooring tab from the reinforced concrete tab from the pull-down menus above, and turn the flooring reinforcement from Ø8 to Ø12 from the dialog box that appears, it gives an error that the reinforcement is insufficient.
 
In the slab reinforced concrete tab, see for which zone (support-span-support) the missing reinforcement is given. Also, there may be missing reinforcement on the axis in the other direction, not on the axis where you changed the reinforcement. Perform a similar check on the axle in the other direction. If you add the project, we can give a clearer answer.
 
Hello, 1.) Remove the reinforcement locks on your console floors. 2. ) Have the floor analysis done again. 3.) Then change the reinforcement you want to change in console slabs, but do not analyze slabs anymore. If you have to perform a slab analysis, repeat the above procedure. Note: Your project has been taken into our notes for review. Good work
 
Back
Top