I isbandam New Member Jun 12, 2012 #1 Hello. In the program, should the soil thrust be given to the panels as a horizontal load, or should it be given from the floor parameters dialog.
Hello. In the program, should the soil thrust be given to the panels as a horizontal load, or should it be given from the floor parameters dialog.
L Levent Özpak New Member Jun 12, 2012 #2 Hello, Earth thrust can be entered both ways. When the floor parameters are entered in the dialog, the loading combinations of the soil load in the TS500 are made automatically.
Hello, Earth thrust can be entered both ways. When the floor parameters are entered in the dialog, the loading combinations of the soil load in the TS500 are made automatically.