cagdaserel
New Member
As can be seen in the picture I uploaded, the beam loads, especially the beams on which the stud beam is pushed, the fixed load and wall loads appear twice. While the G and Q loads coming from the floor are seen from which floor, the wall load and beam dead load are not visible. We have a hard time explaining this situation to the teacher who is looking at our appeal file for urban transformation (he thinks that we have taken the beam and wall loads twice). Pictureag.com/p1/39af5438e7c.png