Dormitory etc. project differences!

efsane

New Member
dormitory to be solved etc. Which of the values we take into account when calculating the housing projects of buildings differ. such as the building importance factor... in short, what should we consider. Thanks for your answers...
 
building importance factor should be 1.4, live load 350 kg/m2, live load participation coefficient 0.60 is required for initial design. In terms of post-earthquake usage, HK (immediate use) is sought for design earthquake and CG (life safety) is sought for 2% exceedance probability. table 7.7 tdy2007....
 