If there is a load and a system to carry this load, its transfer (transfer) must be done. on the roof; The load of 150 kg/m2 that you will give to the roof floor covers the above-mentioned loads, therefore you will have loaded the beams of the relevant floor. Best regards. (I used the word load a lot, I apologize to my high school literature teacher!) G.KÖSE