Mert Kaymaz
New Member
Hello, I am building a ground+1 building. It has a pre-built pool at +1.40 level. That's why the customer wants the ground floor height at this elevation. However, in the geophysics report, I was told to go to a depth of at least -2.70 m, so I made the raft foundation 60 cm and made 10 cm lean concrete and went up to -2.00 level. I will fill the rest up to +1.40 level. How can I show this in static project?