Deep beam to connect 2 slabs at different elevations

kudret

New Member
A SECTION OF THE BODRUM SCREEN IS 80 CM DOWN, I DEFINED 35/110 BEAM TO CONNECT THE TWO SCREENS AND THE LEVEL OF THE BEAM IS -80, ONLY THE CURTAIN THAT THIS BEAM IS CONNECTED GIVES @14/4 MIDDLE VERTICAL REINFORCEMENT. HOW CAN I SOLVE THIS I HAVE INCREASED THE DIAMETER @20/8 IT IS TAKING A BREAK THAT IS TOO MUCH REINFORCEMENT.?
 
The colon says P1 in the application Hello Mr. Yasin, when I get the colon application plan, example: 12@16 should be written, but P1 says 12@16, why?
 
Re: Colon writes P1 in the application
"kudret":1waxf9rq" said:
Hey Yasin, when I bought a colon application plan, example: 12@16 should be written, why is P1 12@16 written?
Hello , Pose numbers are written because "Draw reinforcement pose numbers" option is checked in column application plan settings. Uncheck and get column application plan again. Good work
 
Back
Top