In U-shaped curtains designed for elevators, I encounter the problem of shear safety in the 1st, 2nd basement and the ground, and it says that the reinforcement is insufficient even though I use 16-gauge reinforcement in some floors. In my previous projects, I was putting two curtains on each other and I did not encounter this problem. Even if I raise it, it throws 16 iron at intervals of 5 and 6 yellows. A bit of an exaggerated result came to me. I'm entering the wrong data somewhere, I would appreciate it if you could help. the file is attached
You do not have permission to view link
Log in or register now.