Curtain reinforcement gap at the edge of elevator and stairs

statikçim

New Member
When I created a drawing in my project, vertical reinforcement was thrown very often on the basement floor in only one of my curtains (the curtain that continues to the upper floors), I wonder if concrete would get in the way? When you go to the upper floor, the vertical reinforcement decreases. It's just like that in the basement
 
"staticçim":2paskibr" said:
When I created a drawing in my project, vertical reinforcement was thrown very often on the basement floor in only 1 of my curtains (the curtain continuing to the upper floors), I wonder if concrete gets in the way? When I move to the upper floor, the vertical reinforcement decreases. Only in the basement floor /quote] Hi, The amount of reinforcement is related to the design moment of the shear wall. If you increase the diameter of the reinforcement, the reinforcement will not be seen frequently because the number of reinforcements will decrease. You can also make changes in the system to take less moment. If we see your project, we can write more precise answers.
 
Back
Top