coskun3561
New Member
Hello; The headboard areas on the carrier curtains that continue throughout the building get smaller on the upper floors. This shrinkage can cause problems in connecting the reinforcements in production. As far as I can see, the masters continue with their own comments. Is there a way to maintain the size of these zones in the same way on the upper floors? I couldn't find it in the program. Good luck with