Curtain group reinforcement deficiency

I made a curtain group for the first time, but I'm getting a lack of equipment, I can't save it, can you help me.. version idecad 10.20 Sincerely
 
Hi, Arrange the P03 and P04 short curtains connected to the curtain groups as "short head curtain" from the properties on all floors. Decrease the stirrup spacing on floors that have shear problems in the reinforced concrete dialog of the curtain group.
You do not have permission to view link Log in or register now.
Floor curtain and raft finite element to increase calculation accuracy We recommend making analysis by reducing the widths. (For example 25 cm) Good work
 