Curtain cut safety issue

mimarss

New Member
Good work friends. I can't overcome the curtain cutting safety problem in the basement and ground floor even though I apply the suggestions written in the forum. Can you review my project and advise. Have a nice day.
You do not have permission to view link Log in or register now.
 
Hi My Suggestions --Remove the stiffness of the 1st basement floor from the floor general settings, --Make the concrete C30 --Make the P06 curtain 30 cm on the 1st basement and ground floor. --You can reduce the movable and wall load in the attic, --when you add the foundation, it may not save with some section. --Add the ladder and solve it together with the building, --since you put the curtains in one direction, the other direction is weak, I recommend you to add curtains to the weak direction. Unver ÖZCAN
 
Hello friends, in my project consisting of 2 basement + ground + mezzanine and 17 floors, what I did with my 2 curtains on the basement floor gives the problem of insufficient cutting safety + reinforcement. For shear safety, I increased the size of the beams attached to the curtain in whichever direction there was a problem. I increase the diameter of the reinforcement and the program starts to increase the reinforcement intervals between 3 and 5 cm. I increase the concrete class, it still doesn't work. I'm increasing the size of the curtain still didn't work. No matter what I do, I could not overcome this curtain problem, I would appreciate if you could help
You do not have permission to view link Log in or register now.
 
"Dira":3iuci612" said:
Hi friends, in my project consisting of 2 basements + ground + mezzanine and 17 floors, my 2 curtains on the basement floor give the problem of shear safety + reinforcement insufficient, whatever I did. I increased the size of the beams connected to the curtain in whichever direction there is a problem for shear safety. It still didn't work. I increase the diameter of the reinforcement. The program starts to increase the reinforcement intervals between 3 and 5 cm. I increase the concrete class, it still doesn't work. I increase the size of the curtain again and it didn't work. No matter what I did, I couldn't overcome this curtain problem. I would appreciate it if you could help me
You do not have permission to view link Log in or register now.
Hello, We talked to you on the phone before. I told you that you need to increase the curtain ratio on the first four floors. In the program, the AlfaS control is on the floor above the foundation or one floor of the floor that is considered rigid. However, AlphaS rates for each floor are printed in the Earthquake Regulation General Report. If you want, ignore the warning and refer to the alfas values on the next floor. You can decide. But to solve R=6 hash system; You need to increase the alpha s values I marked by adding curtains to these floors. Since the floor area of the floor is large in these floors, the alpha s values are small. P8 curtain is forced to bend. It requires more reinforcement area in the middle of the column. You should thicken or enlarge the P8 and P10 curtains. Also, even if you increase the concrete class, it can relax without bending.
 
Back
Top