Curtain Cut Safety Floor in a Single Curtain in My Project

gencideci

New Member
For a project we have done with ribs before, since the floor height with the basement (if the basement is rigid is not counted) exceeds 17.70, it was said that the beam or cassette would be solved, we solved it again with tape by the building inspection, and it gave a few column errors. I just got over it by enlarging it in the basement. but it gives the error "does not provide shear safety" on a curtain of the ground floor. I have given my project in the link below. I'm waiting for your ideas and suggestions...
You do not have permission to view link Log in or register now.
Work.ide10.html
 
Hello there; - First of all, you must comply with the constructive conditions in TS500 for bidirectional gear flooring. In other words, you should choose your tooth spacing max 70cm in both directions. You have chosen 100cm. - Using the TBDY2018 wizard, you must select the appropriate system and select the appropriate R and D. (You don't have enough bulkheads to choose a mixed system, choose a highly ductile system) - Use curtain body stirrup diameter minØ12. - Extend the curtain that you have given the upper level for the elevator platform on the last floor, constructively in the drawings or define the elevator machine room to the system. - Correct your stair modeling and stair support definition incorrectly. - Arrange your formwork plans, offset your beams to ensure continuity, and review your beam directions. If necessary, edit it to ensure continuity with the Beam-Foundation / Determine Object Orientation command from the Change menu. You have too many and unnecessary angled beams, insert as many beams as possible in the x and y axes, for this you will need to revise your column dimensions. Best regards.
 
Back
Top