HI...
"abdullah-70":5ao6frvu" said:HELLO....Even though I connect the nodes correctly, as you can see in the image, there is a gap.
"Levent Özpak":vtwva0ws" said:"abdullah-70":vtwva0ws" said:HI... /quote] Click the "Object trim method" command in the left hand side toolbar. Click the end of the beam K22 connecting to P16 and change the trim algorithm. The floor space will be eliminated. Note: We definitely do not recommend checking the "Consider the contribution of the tie beams (Nv) that do not meet the 1/3 condition in the shear overturning moment calculation" option in the Analysis Settings / TBDY Options tab, in this state of the regulation. Due to the mixed system in your project, unidirectional gear laying solution conditions are not met. Good work
Check the "Consider the contribution of tie beams (Nv) that do not meet the 1/3 condition in the calculation of shear wall tipping moment" option in the Analysis Settings/TBDY Options tab. We definitely do not recommend it as it is."abdullah-70":smhqr8j0" said:How do you think about the project in general?