Your thoughts on the design, apart from the problems in geometry control, I think that the building will be ground + 9 floors. While drawing a static project, is it enough to have no problems in the structure by making analysis only in line with the project information to sign the project? (Is a performance analysis necessary for a project to be built for the first time?) I would be very grateful if you would share your information.