Creating a carrier system

hasipd

New Member
Your thoughts on the design, apart from the problems in geometry control, I think that the building will be ground + 9 floors. While drawing a static project, is it enough to have no problems in the structure by making analysis only in line with the project information to sign the project? (Is a performance analysis necessary for a project to be built for the first time?) I would be very grateful if you would share your information.
 
Hello
"hasipd":25e6zye7" said:
Is it enough that there is no problem in the structure by just analyzing the project information while drawing a static project
It is not enough, it is important to evaluate with the eyes of an experienced engineer,
"hasipd":25e6zye7" said:
(Is a performance analysis necessary for a project to be built for the first time?)
Performance analysis is for a strengthening project. This analysis is not done in a new project. My suggestions for this project are; --Make 25/32 beams 25/50 around the building, --Lower K19-K22 cantilever span too much, --Choose high instead of mixed system, --Rib beams center columns, --Floor may not be safe, --Carrier rib beams now it doesn't even save, it needs to be thickened, --The curtains may not be enough Ünver ÖZCAN
 