If your ground safety stress is 15 tf/m2 and the Soil group is A, B or C, Analysis Settings / In the Foundation-Soil tab, the option "Increase the soil stress by 50% when using earthquake loads" can be checked. TDY article 6.3.2.1"a_kahveci":1wffphqf" said:Hello, I couldn't fix the tiling faults in the project that I threw in two parts due to its size, can you help? quote]Also, it gives a zg error on the raft, is it possible to fix this error by taking the ground safety 15? Does anyone know what to try?
In our computers, the project analysis time is 30 seconds. around. If you install the 8 version of the Teamviewer program and call us, we can examine the problem in more detail by providing remote access to your computer."a_kahveci":1wffphqf" said:also the analysis started to take a long time recently, the same projects used to finish in 20-30 seconds before now It takes 2-2.5 minutes, what do you think it depends on