Hello. I have a project with 11 floors. I want to solve it as cork flooring. There are floor gardens on 4 floors. hence low laying is required. How to act in this situation? Is there an option to solve the floors with normal floors with cork low floors with beams? I would be grateful if anyone with knowledge on this could help.