Control..

bedros

New Member
first of all hello everyone. I have a project that I'm drawing today. I am trying to make a static account of the projects I have collected from friends here and there in order to improve myself. I would like to examine the ide file I have attached and ask him to help me if I have any mistakes.. Thanks in advance to all my friends who will be interested
 
Give ide7.019. has been drawn. I saved it in the 6th version of the ide, and friends who can't open it can open it here.
 
Hello, *Since there is no perimeter curtain on the 1st basement floor in your project, it would be appropriate to enter the upper rigid basement floor number -2. *one. Reinforcement axes of D04 v D07 slabs in the basement floor have protruded beyond the slab. *The attached join.pdf file related to Join Security in Columns (B) can be examined. Good work
 
"Levent Özpak":39xmbs64" said:
Hi, *Since there is no perimeter curtain on the 1st basement floor in your project, it would be appropriate to enter the upper rigid basement floor number as -2. *The reinforcement axes of the D04 v D07 floors in the 1st basement floor protruded beyond the floor .(There is a problem in the reinforcement drawing in the formwork plan.) The slab must be redefined or the relevant reinforcement axes must be deleted and re-entered. *The attached joint.pdf file on Joint Safety in Columns (B) can be viewed. Good work
Thank you very much for your interest bey.
 
Back
Top