GOOD DAY... IN THE MAIN PROJECT IN THE 1st PHOTO, THE CONNECTION OF P04 AND S04 WAS PROVIDED WITH TK 31 STRAP... IN THE 2nd PHOTO (IF IN APPLICATION) THE CONNECTION OF THE P04 AND SO4 COLUMNS (TK31) WAS MADE WITH THE FAULT DUE TO THE PROJECT... MY PROJECT:1) SO THERE WAS ANY PROBLEM IF IT IS DONE IN THE 2nd PHOTO... WHEN I PERFORMED THE FUNDAMENTAL ANALYSIS, I DID NOT RECEIVE AN ERROR ABOUT THE GROUND EM.GER. ACCORDING TO THE 2nd PHOTO... I JUST RECEIVED 3-4 INSTALLATION REINFORCEMENT LACK ERROR...