Continuous baseline report

SKUSCU

New Member
When the report is received in the project whose analysis has been completed in version 8.50, all of the values appear as 0 in the basic static results, but when the report is re-analyzed, the values appear. Good work.
 
Hello, Analysis has not been done in the project, you can see the basic static results when Analysis + Reinforced Concrete is done.
 
Mr. Yasin, the problem is this is a project that I analyze there, it should be agreed with the equipment and values. I made the analysis, prepared the drawings, got the report and saw that the results were 0. After analyzing again, the values appeared in the report. However, when the recorded file is opened and a report is requested, the values still appear as 0.
 
Hello there. Yasin, I am also facing the same problem. Projects from the Municipality are constantly returning. For some reason the values are 0 and also the names of the continuous bases don't seem to hold the columns at all. respects.
 