When a part of the foundation of the building is a raft foundation formed by the slab edge, the other foundations are a continuous foundation or a single foundation; Is it a correct approach in terms of the program to connect a tie beam and a continuous foundation beam (not framing the raft foundation) from any point to the raft foundation formed by the slab edge from the continuous or single foundation on which the column is located?