damlaozgur
New Member
Hello, a project was requested from us for the poured field concrete of an industrial area of approximately 15,000 m2, the municipality will license it. There is no structure on it, only containers will be set up and removed from place to place. On-site slab thickness is 20 cm, but I cannot draw a raft less than 30 cm thick. I increase it to 30 cm, but this time the ground does not provide safety. What path can I follow?