mertkaanari
New Member
hello, the geological engineer asked me for Ptv, the design vertical pressure force acting on the foundation base, but I can't find it in the reports. can you help me. thanks in advance, good work
Hello, for what purpose is Ptv requested? As the vertical pressure force acting on the foundation base or for the vertical design force to be used for pile foundation application?You can also send your project."mertkaanari":13bhkwei" said:hello Geological engineer asked me for Ptv, the design vertical pressure force value acting on the foundation base, but I can't find it in the reports. can you help me. Thanks in advance, Good work
Yes It is required as the vertical pressure force acting on the foundation base. I think it was needed in the ground report to be prepared according to the new earthquake regulation. I also added the project."YasinTezel":3j8c4fo0" said:Hello, for what purpose is Ptv requested? As the vertical pressure force acting on the foundation base? Or is it for the vertical design force to be used for the pile foundation application? You can also send your project."mertkaanari":3j8c4fo0" said:hello Geological engineer asked me for Ptv, the design vertical pressure force value acting on the foundation base, but I can't find it in the reports. can you help me. Thanks in advance, Good work
It must be from the WINRAR Version, I'm adding it one by one."Medeniyetmuhendisi":36mpo3gd" said:I heard that too, geological engineers want a vertical pressure force to be taken as a basis. There is a problem in the rar file, it doesn't open, I would appreciate it if you could renew it. Shall we look at these basic stress graphs from the analysis system display options, or is it in the report? We can see point-by-point stresses on the raft, but I don't know exactly what is required.
Yes, as you said, the geotechnical report has been added. Thank you for all the information. Let's see what to ask for permanent foundations, if anyone encounters it, I would be happy if they share it here."saridurmus":29jx9i66" said:Foundation type and bearing capacity will be given to you by geotechnical experts, not geological engineers. Three people are required to prepare the soil and geotechnical report at TBDY 2018. 1- Geological Eng. 2- Geophysical Eng. 3- Civil Engineering Eng. (Geotechnical engineer or specialist)
"Medeniyetmuhendisi":1wor8x4p" said:Yes, as you said, geotechnical report has been added. Thank you for all the information. Let's see what will be asked for permanent foundations, if anyone encounters it, I will be happy if they share it here. He wants the person who prepares the soil improvement project to be a Geotechnical expert where soil improvement is required."saridurmus":1wor8x4p" said:Foundation type and bearing capacity will be given to you by geotechnical experts, not geological engineers. In TBDY 2018, three people are required to prepare the soil and geotechnical report. 1- Geological Eng. 2- Geophysical eng. 3- Cons. Eng. ( Geotechnical engineer or specialist)