Column overlap length

Muhpen

New Member
Hello. Even though I changed the overlap length condition in the reinforced concrete parameters, 69 cm overlap is made for the 20 gauge reinforcement in the columns. How can I increase the overlay height?
 
hello, I am getting this warning and I made the basement without flooring because it has a sub-basement. What should I do for the stiffness problem. Please help
 
"emrebzn44":gwb6g6wb" said:
hello, I am getting this warning and I made the basement without flooring because it has a basement. What should I do for the rigidity problem. Please help
WIPE THE BALCONY ON THE BASEMENT AND TRY IT. SOMETIMES THOSE UPLOADS CAN MAKE STAPLING ERROR.
 
"emrebzn44":36y9ljqj" said:
hello, I am getting this warning and I made the basement without flooring because it has a basement. What should I do for the rigidity problem. Please help
Semi-rigid diaphragm solution. You can model the basement floor as completely rigid without a diaphragm by ticking the "create diaphragm" option. If that slab sits on the ground, you do not need to define it.
 
Hello there; Since you cannot define the wall load on the curtains in the basement, the wall areas will be calculated as zero when calculating the shear areas of the ground floor. Therefore, in such a case, you are likely to receive a weak floor warning on the ground floor. To solve the problem; You must manually write the wall areas that should be in the White column for the ground floor in the Analysis and Design menu / Floor Parameters / Irregularities table. If your floor plans are similar, you can use an upper floor wall area or basement floor area as a reference. Best regards.
 
Topic strayed from the title. I'll turn it down. 60 cm overlap for Ø16 reinforcement. How should the overlay size settings be? Can you take a screenshot of this screen (General Reinforced Concrete Settings)?
 
"mulugol":pt42e004" said:
The topic has deviated from the title. I will reject it. 60 cm overlap is seen for Ø16 reinforcement. How should the overlap length settings be? Can you take a screenshot of this screen (General Reinforced Concrete Settings)?
Hello , The overlap length cannot be taken less than lb in the middle region of the columns in TBDY 2018. Currently, the overlap length is taken as lb in ideCAD. It cannot be adjusted from the General Reinforced Concrete settings. We have request notes for changing the overlap length. TS 500 urbanization length calculation. Concrete class C25 is 60 cm for Ø16. comes out.
 
Hello.. In some columns, the sprout length above the foundation is 60 cm after 90 cm, while in some it is 60 cm after 120 cm. In other words, the overlap heights vary. What is your reason?
 
"huseyinakkus56":33rdaznb" said:
Hello.. In some columns, the sprout length above the foundation is 60cm after 90cm, while in others it is 60cm after 120cm. So the overlap heights vary. What is the reason?
Hello, Overlay length is 60 cm, but the free lengths of the elements are different. One is 245 cm, the other is 290 cm. The overlay attachment is made in the middle of the column as per the regulation. Since the free height is different, the length at the top and bottom will naturally be different. For 290 cm, the length above and below ( 290 - 60)/2 =115 cm For 245 cm, the length remaining above and below is rounded off to (245-60)/2= 92.5 cm ->95. Example:
 
Back
Top