Hello, how do we enter column free height in a project? For example, between a 0.5 m floor slab and a 3.60 m building, there is a 2.0 m high beam connected to the column. The beam dimensions are 25/50. then do we enter the freedom of that column as 1 m? And do we only enter for the floor it is on? -1 is not bad, we are writing 1 m directly, right? I was confused because the program took the 0 level from the ceiling of that floor. I didn't know if I should write -2.10 or 1 meter. thanks in advance.