Dear forum elders. Due to my busy and sleepless work, I unfortunately forgot to put a ledge on the ground floor on both sides of my static project. I should have done the same as the exit on the 1st floor on the ground floor. And again, unfortunately, the building was overlooked by the inspection. While the project was being carried out on site, the same overhangs as on the upper floor were placed on the ground floor, based on the architectural project. While I was revising the project, I fixed the reinforcements of the foundation and ground floor and overhanged the system, but I could not solve the system in this way. I'm getting errors in the columns. Since I can't change the columns, should we strengthen them or can the situation be saved by changing the reinforcements on the upper floors and drawing a revised renovation project? The link of the project is below.