I was undecided about designing the project I sent in the attachment as it is and wanted to consult you. The B+Z+4N storey project is currently in the study phase. Beam loads, stairs etc. I did not enter the model. I am waiting for your suggestions about the carrier system. Thanks...
 
Mr. celikus My suggestions: -- Let the beams center the columns -- Put cantilever beams to the left of the K01 and K10 beams -- Make the K01-K02-K03-K04-K39 beams 60 cm (don't change the cross section, the other beams have the same situation) -- The number of floors is higher put an earthquake curtain in both directions -- turn the D21 rib in the same direction as the continuation of the D20. Take it easy Unver ÖZCAN
 
"unver":8hz49f3w" said:
Mr celikus My suggestions: -- Let the beams center the columns -- Put a cantilever beam to the left of the K01 and K10 beams -- Make the beams K01-K02-K03-K04-K39 60 cm (do not change the cross section, on other beams) There is the same situation) -- If the number of floors is more, put earthquake curtains in both directions -- Turn D21 rib in the same direction as the continuation of D20. Take it easy Ünver ÖZCAN
Thank you for your interest, Mr.
 
Back
Top