dündar selçuk
New Member
I analyzed a project with both concrete grades C20 and C25 without changing the concrete sections. Contrary to expectations, as can be seen in the attached excel table: 1- Increases occurred in column stirrups 2- Beam additional reinforcements. Waiting for your valuable comments. Note: Even though I compressed the project, I couldn't add it because it is larger than 10 MB Operating system XP; Version: 7.018