take it easy, friends.. I'm building a family health center with 5-6 doctors, what will I get the building importance coefficient?
 
Hello. You can put it in the type of buildings that should be used after the earthquake. Get I=1.5 Unver ÖZCAN
 
Hello, in the attached project I will do performance analysis, although I get the building importance factor of 1, the report prints 1.5. I cannot change the wizard passive as I do not select the 2018 regulation. Can you check
You do not have permission to view link Log in or register now.
ÖYLÜ_performance.ide10.html
 
Hello, The place you show in the picture is the parameters related to the 2007 regulation, the report you get is the TBDY 2018 report. Analysis settings wizard is only used for 2018 TBDY settings. If you are making a new project, make a solution according to TBDY 2018. - Select TBDY 2018 in the analysis settings - Complete all the steps by running the TBDY 2018 Analysis settings wizard - BKS=1 I=1.5 will be defined in the TBDY Options tab as shown in the picture. - When you receive a report, it shows as I=1.5. If you are going to get a report according to 2007, turn off the TBDY 2018 Earthquake parameters report in the Optional reports.
 