I didn't start a new topic as I'm going to write a few topics in a row. I write respectively (whatever it means) or mixed: 1- When more than two reinforced concrete calculation axles pass at the same point on the slab without beam (or raft without beam), does it include all the calculation axis reinforcements when calculating the additional reinforcement at that point? In the picture I have attached, some regions are scanned with more than 2 reinforced concrete calculation axles. What is the status of the additional reinforcements on the column in this region? 2- It gives the warning of missing Aces in additional reinforcements on the floor without beams. We can see this when we enter the slab reinforced concrete or in the optional report. Although "Check for eligibility when receiving a report" is active, it does not appear in the negative list As in the example picture. 3- When using the "join" command on the reinforced concrete screen, the reinforcement should be fixed. Or the merges should at least be stored within themselves. Example: We did 3-4 merges on the same screen, we had not pressed the OK button because we had not left the screen yet. We realized that the last thing we did was wrong. There is no undo, we have to press the cancel button. In this case, the 2-3 merges we made before are also gone. 4- There must be an option to zoom in on the drawing on the merge screen. In large areas, reinforcement areas are intertwined in close columns. At least it could be a simple zoom like the polygon column command. 5- While the curtain columns are applied according to the axis to which they are attached in one direction, they are not applied according to the axis to which they are attached in the other direction. There is no measurement. See project column application drawing. 6- In the same project, there are no crossties in the middle polygon columns in the column application!? 7- I have not come across a document about the order of operations on Linear Performance analysis. I looked in the book and did not see such an explanation. Didn't I find it? There is analysis + reinforced concrete, there is foundation analysis, there is also slab and staircase analysis. No information on linear performance analysis. There are only issues related to marking the buttons related to linear performance analysis in the analysis menu, there is no separate title. 8- There was a question about the load library today. Don't we have a chance to use the load we added to the load library in another project? (It says there is in the book) I entered additional loads as both floor load and beam load. It exists when I open the current project, but it does not appear in any other project. Is there a way to do this, or rather, is there an easy way? Otherwise, a long way comes to mind, like doing it on a template project. But unfortunately, something comes to mind while this is working and you can't add it to the template right away.
You do not have permission to view link
Log in or register now.