Hello, we are trying to learn the demo version, when we want to select the reinforcement in the beam reinforced concrete section, no matter how much we increase the number of reinforcements, we do not receive a price warning (but if we repeat the analysis, we get a purchase warning, this control does not take place interactively during the selection of the reinforcement), besides, we do not get a warning whether the reinforcement fits into the cross section or not. There is no warning, we did not see the possibility of placing the support reinforcements in the second row in the section, as if all the reinforcements are placed in the same row.
 
"Mbrg":19gr4z34" said:
Hi, we are trying to learn the demo version, when we want to select the reinforcement in the beam reinforced concrete section, we do not receive a purchase warning no matter how much we increase the number of reinforcements (but if we repeat the analysis, we get a purchase warning, this control does not take place interactively during the selection of reinforcements. ),
Hi, -Maximum offset warning is caused by the fact that the reinforcement area requirement consisting of section design moments exceeds the limit value (0.02) given in Tdy 2007 and 3.4.2.4. To solve the problem, the section can be enlarged, arrangements can be made in the carrier system that will reduce the design moments
Besides, there is no warning about whether the reinforcement fits in the cross section, we did not see the possibility of placing the support reinforcements in the second row in the section, as if all the reinforcements are placed in the same row.
Double row reinforcement is not placed automatically in the program. Good work.
 
Hi, When the accessory is changed by the user, the max. There is no pursantage control. There is no double row reinforcement option for beams.
 