MühendisKUTLU
New Member
Hello. How can we make the basic modeling of a 4-leg steel pole with a height of 25 m and a weight of 16 tons, with a cable force of 8 tons at the end? They said that you can accept 10*10 m for the width of the foundation. We do not have the ground information required for the foundation yet. We want to do the modeling first and then continue the work according to the data situation.