B+Z+14 kay project urgent please

yavuzburak

New Member
Hello, I am a final year civil engineering student. I have an assignment I'm trying to do right now. I entered the elements of the project, only basic and analysis remained. However, I couldn't quite do it. Is there anyone who can help with this?
You do not have permission to view link Log in or register now.
Project link is above. Project information: Z3, Ground=2.0 kgf/cm2, K=2470 tf/m3, I=0, Ao=0.20, Rx=5.8 Ry=5.6
 
Re: B+Z+14 FLOOR PROJECT URGENT PLEASE my dear friend, with which of the lowest floor will you draw the plan of that floor to make the foundation. Then, after converting the static plan to the architect plan, you will turn around the building with the space edge determination icon next to the floor icon to enter the apartment distances and then lay it in this closed area. You can adjust the thickness and static settings of the tile from the tile settings window that opens by double-clicking on the tile. In order to see the values of the ground, there is a TDY section in the window that opens from the analysis / analysis settings tab, you can come there and enter the necessary information.
 
Re: B+Z+14 FLOOR PROJECT URGENT PLEASE You should come to the section related to the floor under the same analysis/analysis settings tab and see the floor safety values and the bed coefficient and see the boxes at the top where you can write this information.
 
More than 110 cm raft laying cook. The thickness of the raft may vary according to the square meter of your building, but it is 110 cm more. I have no idea exactly why the error occurs here. You can consult our members cakılomer and yasıntezel via private message. they will help you, it will be easy for you.
 
system is correct 1- R coefficient selection is wrong. There are curtains in the system. Take R=6.5 2- Check if the earthquake zone is correct in the 1st degree? Earthquake zone 3- enter the soil safety stress and the bearing coefficient. 4- If the soil group is not class D, you can click the "analysis" option by increasing the ground safety stress by 50%. 5- Click the average ground safety stress in the foundation calculation and select the interactive selection with the superstructure. In a 6- 16-storey building, the foundation thickness can be up to 150 cm, depending on the ground.
 