Ege Statik Proje
New Member
Good work everyone. The design supervisor is required by our district administration for our projects that require foundation piles. They attribute these requests to article G of TBDY 2018 1.3.2. section. In this clause, the regulation says "nonlinear structure-pile-soil interaction calculations in the time history domain" are subject to the design supervisor. 16C.4.1. talks about the cases where we can do our pile calculations with method III and in the pile calculation part linear analysis My main question is, does Idecad calculate the sub-foundation pile analysis according to the method III in the 16th chapter of TBDY 2018? If it has not been adapted to the new regulation yet, will it be adapted in the upcoming updates? and get stuck with the design supervisor thing?