WHEN I REVIEW THE RESULTS OF THE PROJECT, I SEE THAT THE REINFORCEMENTS ARE Stacked ON THE BEAMERS, THERE WILL BE CHALLENGES IN IMPLEMENTATION HOW TO SOLVE THIS FILE LINK
You do not have permission to view link Log in or register now.
 
Hello -- It's better than the first project, --Reduce the live loads on the attic, remove the wall loads, --make the ribs continuous with the adjacent ribs, --I recommend you to solve the beams without pleats, -- The K14 beam is up to d/2 from the curtain. let it go out, --The well foundation is not solved together with the building, you cannot operate it like in this model,(delete the well foundation) --1. If you want the reinforcements to decrease in the earthquake zone, you need to put additional earthquake curtains -- Add the ladder load Ünver ÖZCAN
 
In addition to what Unver Bey said; -Make a solution with a semi-rigid diaphragm -All beams are given a 19 cm thick wall load. -Don't narrow the beam widths on consoles, do the same. -Make the beams in the same direction continuously. (as in the picture) - Review the moving loads. - Break up the ribbed floors where the basement stairs are located with beams.
 
Back
Top