Hello, in the curtain details and vertical details of the curtains given in the application plans, sometimes stirrups (transverse reinforcements) are not written on the opened reinforcement and their length is not given. I couldn't understand why? -------- also, pose numbers and pose circles in various drawings (such as curtain details, column details, beam details) appear in the reinforcement text layer instead of the pose layer. this poses a big problem in parsing and changes. I want all pose circles and pose numbers to be drawn on its own layer. -------- In the new version, the possibility of adding loads to the curtains in the horizontal direction (for example, soil load) has been introduced. It would be great if you could explain how horizontal loads are added and how they are checked correctly, how the load is displayed. --- I think it was mentioned before, less reinforcements can be given to the lower floor columns than the reinforcement in the upper floor columns. There is a possibility to check and add reinforcements, but still, this difference better be avoided by the program. For example, the upper floor reinforcement ratio is 1.3%, the lower floor reinforcement ratio is 1.1% and there is a reinforcement difference. If this situation can be prevented automatically, we think that it would be appropriate if the number/diameter at the top could be given to the bottom column. good work.