Anchored bored pile shoring calculation

katibimin

New Member
Bored piles appear as friction or end piles driven under the foundation in practice, and we make this calculation with the module in the program. As it is known, it is necessary to build 2 or 3 or even 4 basement floors for applications such as parking lots, etc., below the basement level of buildings. In such cases, especially if the ground is weak, the application of Anchored Bored Pile for shoring becomes mandatory. In this case, it is not possible to do this with the bored pile module in the current program. Anchored bored pile Retaining calculations and drawings can be made as an additional or separate module to the program in the future. Do you think about the module. If it happens in the future, of course, it will be an innovation for the ideYapı family. If this opportunity may take a lot of your time and cannot be realized in a short time, can you recommend us a local software with which we can make the shoring calculations with Bored pile anchors. Thank you for your interest and I wish you good work, my secretary.
 
Back
Top