About the ratio.

ismailkara

New Member
Hello friends, I'm making a static solution of a project with a construction area of 1168m2, using idecad 8. The contractor constantly gives examples from other projects and says that the quantities are very high, and I personally wonder if I am doing something wrong. I talk to him as this is the right thing, this is what it should be, but is there a friend who can help, who can look at the project for 5 minutes.
9NGryr.png
You do not have permission to view link Log in or register now.
 
Hello. Some contractors do not object if you make the reinforcement wire and their thickness is 5 cm. The first priority should be to make the project right, when you get it done right, you will get economic results in the program. My suggestions; You have not made the foundation of the S26 column. Since it would be too long to write the others one by one, I fixed the project in the attachment. You can also make curtains what you have given as 25/225 columns on the elevator side. Unver ÖZCAN
 
I reviewed and edited the project. Thank you very much for your interest, I am using idecad for the first time for the solution, but it was not bad, I think it was a very healthy system. Thank you again, take it easy.
 
Back
Top