About the detail drawings of the sub-basement curtain and the column.

bartayd

New Member
Column sprouts should be left in the column detail during the foundation pouring in the building with plinth, but this detail is not shown in the drawing. it is understood that the column shoots will be left as much as the floor height during the sub-basement casting. Can we draw a sub-base sprout detail like the basic sprout detail?
 
"bartayd":2apd03ch" said:
column sprouts should be left in the column detail during the subfloor pouring in the building with subfloor, but this detail is not shown in the drawing. It seems as if the column sprouts will be left as the floor height during the subflooring.
Hello, In the program, column length reinforcement expansions and sprouts are created according to the floor logic. No sprouts are left in the reinforcements drawn in the same floor. You need to edit the drawings. (Or the option to enter the basement height as a separate floor to use in the drawings can be considered.)
 