New Member
Have a nice day . In a reinforced concrete project that I am in the design phase, I have small problems. We are solving the foundation raft and it is a project with a large seating area. For this reason, the foundation concrete cannot be poured in one go. As a matter of fact, I have a concern that adherence cannot be achieved in the foundation concrete and cold joints may form. What kind of precautions can I take in the design and manufacturing part to prevent cold joint ? Thank you to everyone who reads and replies, keep up the good work.
 
"AtalayKivanc":217h2hk9" said:
Good day. I have some problems with a reinforced concrete that I am in the design phase of. We are solving the foundation with rafts and it is a project with a large seating area. Therefore, the foundation concrete cannot be poured in one go. As a result, the foundation concrete cannot be adhered to. and I am worried that cold joints may occur. What precautions can I take in the design and manufacturing part to prevent cold joints. Thank you to everyone who read and replied, good work.
You do not have permission to view link Log in or register now.
You do not have permission to view link Log in or register now.
You do not have permission to view link Log in or register now.
good work.
 
Back
Top