About the cassette flooring drawing

"emrahkoyuncu":klfh70zp" said:
good day friends, hello, I had a problem, I would be grateful if you could help me. After creating the system and performing the static analysis. During the drawing phase, while creating the cassette expansions, it creates unnecessary sections, for example, instead of creating 2 sections for a slab, 4 sections are created. It creates unnecessary. I wonder why.
Hello, Can you attach the project file?
 
The project was created at a coordinate far away from the origin. Move a location near the lower left corner of the project, for example the 1-A axis intersection, to the origin point. Note: A continuous foundation is not defined under some basement curtains. In the pavement interactive solution, this may also affect the pavement analysis results. Good work
 
Back
Top