About Beam Loads

kaplans007

New Member
Hello friends. Just a moment ago, my brother, a civil engineer at the municipality, said that I reduced the running loads while checking my performance analysis. But the interesting part is that I didn't play with loads. Then I came and looked. In the reports 1 year ago, 19 hole bricks were 0.8 tf / m, while the version 8.50 is 320 tf / m. What could be the reason for this? I have attached the pictures below.
 
"kaplans007":8hw67g4j" said:
Hello Friends. Just a moment ago, my brother, a civil engineer at the municipality, said that I reduced the curing loads while checking my performance analysis. But the interesting thing is that I did not play with the loads. Then I came and looked at the reports 1 year ago. /m is outputting 320 tf/m in version 8.50. What could be the reason? I have attached the pictures below.
Hello, There is a problem regarding the display of Linear Load value in the Load analysis report in the 8 version of the image you attached, and it is among our notes. There is no problem. It can be checked that the wall loads are taken in accordance with the project from the beam loads report. Good work
 
Back
Top