huseyinakkus56
New Member
Hello.. In the project, I will increase the beam depths from 50 cm to 55 cm upon the request of the contractor. (The existing molds in their hands are 55cm) The project is large, in this project that I have drawn before, can I find only the beams that I entered the wall load on from the building tree or in another way, or should I find and choose one by one?