A2 and A3 Irregularities

The control of whether there is an A2-A3 type irregularity in the structure is under the control of the user according to Tdy 2007 article 2.3.2.2 and figure 2.2. The user decides whether there is an A2-A3 type irregularity in the structure according to the conditions here. And in the Analysis/Floor parameters/Irregularities tab it marks or does not. This information is printed in the Earthquake regulation General report.
 
"Levent Özpak":vcvm2y5z" said:
The control of A2-A3 type irregularities in the structure is under the control of the user according to Tdy 2007 item 2.3.2.2 and figure 2.2. The user decides whether there is an A2-A3 type irregularity in the structure according to the conditions here. And it marks or does not mark in the Analysis / Floor parameters / Irregularities tab. This information is printed in the General report of the Earthquake regulation.
Dear Sir, I am aware of the points you mentioned. In my question I wanted to mention, "When we mark A2 and A3 irregularities in our structure, when we mark it in floor parameters where does the program include this in the accounts?" does this markup interact with anything? Is it just a statement made by the user in the reporting section? Does it have a technical effect?
 
In buildings with A2 and A3 irregularities, you should take into account the effects of floor slabs and ensure that your building transfers this safely. If you think that there is such an irregularity in your structure, you can add floor diaphragms to the work and check that it transfers horizontal loads safely with a "semi-rigid" diaphragm.
 
"engineer_yildiz":22p448xf" said:
"Levent Özpak":22p448xf" said:
Checking whether there is an A2-A3 type irregularity in the structure is under user control according to Tdy 2007 clause 2.3.2.2 and figure 2.2. The user decides whether there is an A2-A3 type irregularity in the structure according to the conditions here. And in the Analysis/Floor parameters/Irregularities tab it marks or does not. This information is printed in the Earthquake regulation General report.
Dear Sir, I am aware of the points you mentioned. In my question I wanted to mention, "When we mark A2 and A3 irregularities in our structure, where does the program include it in the calculations when we mark it in the floor parameters?" whether this marking interacts with anything? Is it just a statement made by the user in the reporting section? Doesn't it have a technical effect?
Yes... It is the user's declaration whether to mark these lines or not. It has no technical effect.
 
Back
Top